Welcome to the official website of Chengdu Yannuo Boiler Manufacturing Co., Ltd!
Boiler manufacturersYannuo Thermal Energy International standard low nitrogen high efficiency
Hotline:15121186799

中文

Contact Us
15121186799

Mobile:15121186799

Email:303212175@qq.com

QQ:303212175

Add:No. 489, Guanghua East Third Road, Qingyang District, Chengdu

Location:Home > PRODUCT > Fuel (gas) steam >

300-500kg fuel (gas) steam generator

Product details
1. Efficient ω Encircling flue gas heat exchange process
The structure has extremely high heat exchange efficiency between flue gas and water pipe. The inner ring hot water exchange pipe and the outer ring hot water exchange pipe form a natural circulation process, which can effectively reduce the salt content of the boiler and reduce the scaling rate;
2. Equipped with integrated condensing heat exchanger
The natural gas boiler is equipped with high-temperature economizer and low-temperature condenser. The exhaust gas temperature is as low as 66 ℃. After natural gas combustion, steam condensation releases a large amount of high-level latent heat value, fully absorbs the high-level heating value of natural gas, and the thermal efficiency reaches more than 100%;
3. Certificate free and fast steam delivery
The water volume of the inner tank is 48.2l, less than 50L, no certificate is required, the steam can be produced in 5 minutes, and the rated steam pressure can be reached in 10 minutes, so the steam can be used quickly and conveniently;
4. Automatic dosing device, guaranteed thermal efficiency
The unique arrangement of water pipes is designed to cooperate with the water supply agent, automatically add the agent to maintain the feed water pH stable at 11-22, achieve the effect of oxygen removal and scale inhibition, reduce the amount of scale, and ensure the thermal efficiency of the boiler for a long time;
5. Full automatic scale monitoring alarm (AMG)
The scaling of the pipe wall is measured by monitoring the exhaust gas temperature of the body. When the scaling inside the boiler is slight, it will automatically alarm, and when the scaling is serious, it will be forced to shut down;
6. PLC control cabinet and high-end imported accessories (AMG)
7-inch color touch screen PLC control, Italy Baide burner, France Schneider Electric Appliance, southern stainless steel vertical multistage pump;
7. Online remote monitoring system (AMG)
Real time monitoring of boiler operation pressure, exhaust gas temperature, body temperature, natural gas supply pressure, burner operation status (including air pressure and ignition device), water level status, boiler fault information, water pump operation status, etc.
Manufacturing basis
1. The boiler design and manufacture shall be selected in accordance with the provisions of the supervision regulation on safety technology of steam boiler.
2. The heating surface materials and welding rods and wires used in the boiler shall have quality certificates.
3. The boiler shall be manufactured in accordance with JB / t1618 technical conditions for manufacturing pressure parts of shell boiler.
4. Boiler welding shall be carried out in accordance with JB / t1613 technical conditions for welding of boiler pressure components.
5. The welding of boiler pressure components must be performed by welders who have passed the examination in the rules for examination and management of welders for boiler, pressure vessel and pressure pipeline.
6. The boiler nondestructive testing shall be carried out according to the provisions of JB / t4730 nondestructive testing of pressure equipment and Article 82 of supervision regulations on safety technology of steam boiler. 100% flaw detection shall be carried out on the welding joints, and the quality shall not be lower than
II and II are qualified.
7. After the boiler is manufactured, it shall be carried out according to JB / t1612 technical conditions for boiler hydrostatic test, and the test pressure is 1.2MPa.
8. Refer to JB / t1615-91 for painting, packaging and transportation of boiler.
标签:

Contact Us

Chengdu yangnuo Boiler Manufacturing Co., Ltd.

Tel:15121186799

QQ:303212175

Email:303212175@qq.com

Add:No. 489, Guanghua East Third Road, Qingyang District, Chengdu

order:300-500kg fuel (gas) steam generator
看不清?点击更换看不清?

RELATED PRODUCTS/ RELATED PRODUCTS
Online Service
CONTACT

Hotline

15121186799

work shift

Monday to Friday

Company Office Number

15121186799

QR code
ONLINESERVICE